Number Charm logo

Number Charm APK

5.8977

Number Charm

Number Charm APK

Download for Android

More About Number Charm

Name Number Charm
Package Name com.dupuz.game2048.yellow
Category Casual Puzzle  
Version 5.8977
Size 90.15M
Requires Android 5.0 and up
Last Updated May 24, 2024

The classic 2048 mini-game has five modes: 3×3, 4×4, 5×5, 6×6, and 8×8. From easy to difficult, players can challenge them one by one! Moreover, the memory of this game is also very small, which is very suitable for everyone to play when taking a break! In short, if you are a numbers lover, or are very interested in this kind of casual puzzle game, then you must not miss this game!

Game features:

1. Add new elements to make the game more interesting and exciting, allowing us to experience the happy game at any time.

2. Implement smooth games. You can participate in such games anytime and anywhere and enjoy a pleasant time.

3. Slide your finger left or right and operate the corners of the numbers to combine the same numbers into larger numbers.

4. Continuous matches will have additional bonus effects. While operating, you must also observe the overall situation and let your brain work quickly.

5. Your goal is to get more points within the limited time, and constantly break through your limits.

How to play:

1. Slide your finger in one direction, and all grids will move in that direction.

2. When two grids with the same number collide, the numbers will be added.

3. Each time you slide, a number grid will be randomly refreshed in the blank space.

4. When the interface cannot move (when the interface is completely filled with numbers), the game ends; when the maximum number in the interface is 2048, the game is won.

Tricks and tips:

1. First of all, you must be familiar with the rules of the game. First there will be two 2 s, okay, two 2 s, because 2048 is 2 raised to the 11th power. The rule is that a 2 will appear after each move, and only two identical numbers can be added, such as two 2s, two 4s, two 8s, etc., and so on, the combination will double.

2. Second, when we understand the rules, we need to have a central idea. Yes, it is the central idea of Chinese language lessons. Our central idea: use one of the diagonals to put the combined large numbers on one side and the small numbers on the other side, so as to facilitate merging. According to the fact that most people use their right brain, it is recommended that large numbers be placed in the lower right corner and decimals in the upper left corner. As shown in the picture:

3. Third, when the merged numbers become larger and larger, it is easy to put them away. It is recommended to use the snake principle: the S-shaped principle, and merge the larger numbers in order, and try to keep the position of the large number unchanged. For example, picture:

4. Fourth, in order to keep the position of the large numbers as unchanged as possible, it is best to keep the rightmost row or two rows full at all times. In this way, we can ensure that the position of the large numbers in the rightmost row remains unchanged by moving up and down. Generally, After the third row is full, you have to move to the left to destroy the rightmost row.

5. Fifth, if the above situation occurs, you need to increase the decimal number on the far right immediately and restore it to the original status as soon as possible. No nonsense, just experience it for yourself. After all, the master will lead you through the door, and your practice depends on the individual. Practice is the only criterion for testing truth.

6. When playing, it is best to keep the rightmost row or two rows full at all times, so that when moving up and down, the situation formed in the rightmost row will not be destroyed. At the same time, never move to the left except under unavoidable circumstances!

What's New in the Latest Version 5.8977

Last updated on Apr 19, 2024

-Stability improvements and bug fixes.

- Feature upgrades and update levels.

We hope you're having fun playing our game! We update the game frequently so don't forget to download the latest version to get all the sweet new features and levels! Contact us in case you have feedback or any questions!

Ratings and reviews

There are no reviews yet. Be the first one to write one.